top of page
Recent Posts

Mentor Critique 11/14

  • mlreddout
  • Nov 14, 2014
  • 1 min read

For my second mentor critique, we focused on vertical circulation within my building.

Feedback included...

  • Incorporating a centralized elevator to access the office space on the second floor.

  • Placing a stairwell behind or around the central elevator.

  • Including an elevator inside the library for workers and visitors.

  • Adding a grand staircase to the library internally.

  • Placing fire rated stairwells on both ends of the building.

After this discussion I will be reorganizing the block diagrams and working on incorporating a second level lobby.

2014-11-24 13-55-03.jpg


 
 
 

Comments


bottom of page